CMP SUBSTATIONS

  • Project Location: Bristol, ME; China, ME; Sanford, ME
  • Services Provided:
    • Geotechnical consulting.
    • Test borings were performed for each site using an AMS PowerProbe© 9500 VTR to investigate subsurface conditions. 
  • Project Summary:
    • The new substations were constructed as replacements of existing substations.
    • Structures included transformers, bay structures, transmission lines, substation yards, control houses, and other associated elements to the substations.
  • Project Challenges / Innovation: 
    • Subsurface conditions ranged from fill, alluvial sands, glacial till, and shallow bedrock.
    • Resistivity testing was conducted for each site using Wenner 4 Probe method.   
    • Geotechnical design included a range of challenges from earthwork cut/fills, global slope stability, changes in subgrade conditions, various foundation systems (footings/piers/piles), frost design, seismic design, and corrosion potential.