MID-COAST SCHOOL OF TECHNOLOGY
- Project Location: Rockland, ME
- Services Provided:
- Geotechnical consulting.
- Subsurface conditions were explored using test borings with SPT split spoon sampling and NQ rock coring.
- Project Summary:
- Constructed to replace the existing school, the technology center is a two-story building structure with a footprint of 90,000 ft2.
- Construction included site fill of up to 10 feet with a new perimeter access road and parking lot.
- Project Challenges / Innovation:
- The building was underlain by miscellaneous fill and marine deposits overlying bedrock.
- In addition to its geotechnical investigation, SGS conducted a geothermal well study for a planned geothermal heating system.
- The performed geothermal investigation included the installation of a 420-foot test well, estimating groundwater yield potential, chloride testing, and subsequent geothermal conductivity testing.